Available 24/7, Monday–SundayFully insured15+ years experience

[email protected]
Call us 24/70418 973 440 Free quote

Strip-Outs · 3 min read

Commercial make-good strip-outs: how to hand back a lease on time

What a make-good clause usually requires, how to plan a strip-out around your lease end date, and how to avoid paying extra rent in Sydney.

Crew stripping out a commercial tenancy in Sydney with a skid steer and concrete floor breakout underway

The short answer

A make-good returns a leased space to the condition the lease requires, usually removing your fit-out and restoring the base building. To finish on time, start planning six to eight weeks before your lease ends: confirm the scope with your landlord, book the contractor, and plan around building access rules.

What a make-good usually includes

Every lease is different, but common requirements are:

  • Removing partitions, ceilings, joinery and signage
  • Removing floor coverings and patching or grinding the slab
  • Making safe and removing tenant electrical and data cabling
  • Restoring walls and ceilings to base building
  • Leaving the space clean and swept

Plan around the building

Strip-outs in commercial buildings are often limited by:

  • Loading dock bookings
  • Goods lift availability and protection
  • Noisy work hours, often after hours or weekends
  • Isolations of fire services, coordinated with building management

Check for asbestos

In buildings constructed before 2004, check the asbestos register before starting. Anything found is removed by a licensed removalist before the general strip-out continues.

Handover

Photograph every area when finished and walk through with the landlord or building manager. Get sign-off in writing so there's no dispute about your bond or bank guarantee.

Top Tier SiteWorks strips out offices, shops, warehouses and medical tenancies across Sydney, including after-hours and weekend works, and hands back a clean shell ready for inspection.

Frequently asked questions

How long does a make-good strip-out take?

A small office or shop can often be done in a few days; larger floors take longer. Building access rules and after-hours restrictions are usually the biggest factors.

Can the landlord accept the fit-out instead?

Sometimes. Some landlords agree to keep parts of a fit-out for the next tenant. Always get any agreement in writing before skipping work.

About the authors. Frank, Joe and George own Top Tier SiteWorks. Together they’ve spent 15+ years on Sydney demolition, excavation and concrete jobs. This guide is general information. Always check the conditions on your own approval with your council or certifier.

Related: Strip-OutsCommercial Demolition

Need a site cleared, dug out or poured?

Free site inspection and a fixed written quote. Call any time, 7 days.