Strip-Outs · 3 min read
Commercial make-good strip-outs: how to hand back a lease on time
What a make-good clause usually requires, how to plan a strip-out around your lease end date, and how to avoid paying extra rent in Sydney.

The short answer
A make-good returns a leased space to the condition the lease requires, usually removing your fit-out and restoring the base building. To finish on time, start planning six to eight weeks before your lease ends: confirm the scope with your landlord, book the contractor, and plan around building access rules.
What a make-good usually includes
Every lease is different, but common requirements are:
- Removing partitions, ceilings, joinery and signage
- Removing floor coverings and patching or grinding the slab
- Making safe and removing tenant electrical and data cabling
- Restoring walls and ceilings to base building
- Leaving the space clean and swept
Plan around the building
Strip-outs in commercial buildings are often limited by:
- Loading dock bookings
- Goods lift availability and protection
- Noisy work hours, often after hours or weekends
- Isolations of fire services, coordinated with building management
Check for asbestos
In buildings constructed before 2004, check the asbestos register before starting. Anything found is removed by a licensed removalist before the general strip-out continues.
Handover
Photograph every area when finished and walk through with the landlord or building manager. Get sign-off in writing so there's no dispute about your bond or bank guarantee.
Top Tier SiteWorks strips out offices, shops, warehouses and medical tenancies across Sydney, including after-hours and weekend works, and hands back a clean shell ready for inspection.
Frequently asked questions
How long does a make-good strip-out take?
A small office or shop can often be done in a few days; larger floors take longer. Building access rules and after-hours restrictions are usually the biggest factors.
Can the landlord accept the fit-out instead?
Sometimes. Some landlords agree to keep parts of a fit-out for the next tenant. Always get any agreement in writing before skipping work.
Related: Strip-OutsCommercial Demolition



