The short answer

If your Sydney home was built or renovated before 1990, there is a real chance it contains asbestos. Before demolishing any structure built before 31 December 2003, NSW work health and safety rules require asbestos to be identified first. Any asbestos is then removed by a licensed asbestos removalist, the area is cleared, and only then does general demolition begin.

Where asbestos hides in older homes

Asbestos was used widely in Australian building products until it was banned nationally in 2003. Common places include:

  • Fibro (fibre cement) wall and eave sheeting
  • Bathroom and laundry wall linings and floor tile underlays
  • Vinyl floor tiles and the adhesive under them
  • Roof sheeting, gutters and downpipes on older garages and sheds
  • Fences made from fibro sheets
  • Electrical meter boards in older homes
  • Pipe lagging and insulation in older commercial buildings

You can't tell by looking. Only laboratory testing of a sample confirms whether a material contains asbestos.

Who can remove it?

In NSW:

  • Non-friable (bonded) asbestos over 10 square metres must be removed by a licensed removalist holding a Class A or Class B licence.
  • Friable asbestos, crumbly material that can release fibres easily, must be removed by a Class A licensed removalist.

After removal, a clearance inspection confirms the area is safe and a clearance certificate is issued before other work continues.

The right order of work

  1. Asbestos inspection and sampling (an asbestos register or hazardous materials survey)
  2. Licensed removal of any asbestos found
  3. Clearance inspection and certificate
  4. Demolition of the remaining structure
  5. Waste tracking to licensed facilities

What not to do

Never drill, cut, sand, break or water-blast materials you suspect contain asbestos, and don't put them in household bins or skip bins. Disturbing asbestos releases fibres that can cause serious disease decades later.

How we handle it

Top Tier SiteWorks checks for asbestos on every older-home demolition and strip-out. Asbestos is removed by licensed asbestos removalists before our crews start, and we only proceed once clearance is issued, so your project stays safe and compliant.

Frequently asked questions

Is fibro always asbestos?

No. Fibre cement sheeting made after the mid-1980s generally does not contain asbestos, but older fibro often does. Only laboratory testing confirms it.

Can I remove a small amount of asbestos myself?

NSW allows limited removal of up to 10 m² of non-friable asbestos without a licence in some circumstances, but strict safety and disposal rules apply. Using a licensed removalist is the safest option.

Do I need an asbestos clearance certificate?

After licensed asbestos removal, a clearance inspection is carried out and a clearance certificate issued before the area is reoccupied or other work continues.

About the authors. Frank, Joe and George own Top Tier SiteWorks. Together they’ve spent 15+ years on Sydney demolition, excavation and concrete jobs. This guide is general information. Always check the conditions on your own approval with your council or certifier.

Related: DemolitionStrip-Outs

Need a site cleared, dug out or poured?

Free site inspection and a fixed written quote. Call any time, 7 days.